2013 Nov 13 4:58 PM
Hi everyone,
one pretty simple question: we have started defining the mitigation controls in the NWBC of the Dev system. Before proceeding, we were wondering if there is a way to transport these controls, otherwise it is a lot of effort to maintain them twice, as we have a pretty long list.
Thanks in advance for any hint.
Kind regards,
EM
2013 Nov 13 6:19 PM
Erik,
It is true that the mitigating controls are not transportable. However, assignments can, theoretically, be downloaded and uploaded. I have not yet had occasion to do it myself, so I can't vouch for it, but I got it from a reliable source:
Note 1749804 - Download & Upload reports for mitigation assignments
There are also some related Notes (corrections) if you have some issues with it, but you may already have them applied depending on your SP level.
Regards,
Gretchen
2013 Nov 13 5:34 PM
Unfortunately No.. You cannot Transport the Mitigation Controls.
I don't think you need to do create all mitigation controls in Dev, may be for testing purpose you can do it, but you cannot Transport or Upload them.
Best Regards,
Rama
2013 Nov 13 6:19 PM
Erik,
It is true that the mitigating controls are not transportable. However, assignments can, theoretically, be downloaded and uploaded. I have not yet had occasion to do it myself, so I can't vouch for it, but I got it from a reliable source:
Note 1749804 - Download & Upload reports for mitigation assignments
There are also some related Notes (corrections) if you have some issues with it, but you may already have them applied depending on your SP level.
Regards,
Gretchen