Transport

Former Member
0 Likes
1,014

Hi Gurus!

I have had a small change in a report which consits of several INCLUDE programs. Out of the 9 includes in it I had toi make change in 3 of the includes and hence the transports were generated for the 3 includes programs. Now if I want teh changes to refrelect in QAT , do I have to transport all the 9 includes or just the includes where I have made the changes. I have the transport generated fo the main program and the 3 includes where changes are made , do I have to create transport for other includes in the report as well along with the main report and the 3 incl;udes where changes are made.

Please advice.

Thanks

Aarav

1 ACCEPTED SOLUTION
Read only

ThomasZloch
Active Contributor
0 Likes
986

you need to transport only what has been changed.

Thomas

5 REPLIES 5
Read only

ThomasZloch
Active Contributor
0 Likes
987

you need to transport only what has been changed.

Thomas

Read only

0 Likes
986

Thanks everyone for the great help.

Read only

0 Likes
986

you're welcome, that was easy

Read only

Former Member
0 Likes
986

Nope, unless you have some changes for the other includes which also need to go to QA, you are fine

Read only

Former Member
0 Likes
986

Transport only those 3 includes