Routine not working when transported

Former Member
0 Likes
1,133

hi,

I created a routine in VOFM and assigned to pricing procedure. It works fine in devlopment server when we transport to production server it is not happening, Object exist in production server even the configuration exists,

When i put a break point it does not stops, where else i am able to do in dev server.

please state the reasons.

regards,

prabhu

points assured.

1 ACCEPTED SOLUTION
Read only

Former Member
0 Likes
888

Hi

The only reason could be that the routine is not called. Maybe this routine is written for certain condition and that condition is failing in production. Otherwise, I see no reason for not stopping at break point.

Regards

Navneet

Hi

The only reason could be that the routine is not called. Maybe this routine is written for certain condition and that condition is failing in production. Otherwise, I see no reason for not stopping at break point.

Regards

Navneet

3 REPLIES 3
Read only

Former Member
0 Likes
889

Hi

The only reason could be that the routine is not called. Maybe this routine is written for certain condition and that condition is failing in production. Otherwise, I see no reason for not stopping at break point.

Regards

Navneet

Read only

Former Member
0 Likes
888

Hi Prabhu,

As rightly aid by Navneet there must be some data issue.Please check all your entries once again.

Regards,

Atish

Read only

former_member195698
Active Contributor
0 Likes
888

Hi,

There can be two reason for the failure other than the ones mentioned above.

1) The Routine might not be activated in VOFM.

2) Try Running the program RV80HGEN for regeneration.

Reward points if useful

Regards,

Abhishek Jolly