2008 Oct 24 5:56 AM
hi experts,
i have done automatric job scheduling with the help of tc-SM36,so that the my report will run on every morning at 9oclock but in the development server i did it n it is working fine what i want to know that i have to do the same thing in the production server will i have to do it directly on the production server or will it be stored in the request number and then i have to transport it to the production server........
plz help me....
2008 Oct 24 6:04 AM
Hi,
The setting can not be included in request.
You need repeat the same steps in production server as well.
Rgds,
Sandeep
Hi,
The setting can not be included in request.
You need repeat the same steps in production server as well.
Rgds,
Sandeep
2008 Oct 24 5:58 AM
Hi
You need to repeat the steps directly on Production Server.
Cheers,
Hakim
2008 Oct 24 6:04 AM
Hi,
The setting can not be included in request.
You need repeat the same steps in production server as well.
Rgds,
Sandeep
2008 Nov 19 2:47 PM
Hello Rajat,
You might want to look into SAP Central Process Scheduling by Redwood. This might solve your problems as SM36/37 is in maintanace mode and will not be developed any further this is a good step to make.
The link is:
The product can be downloaded from the SWDC under Application Group SAP Netweaver, Netweaver 7.0, SAP Central Process Scheduling.
if you have any questions do not hesitate to give me a call 031306354598
Regards,