help for code in resource scheduling in scm-apo

Former Member
0 Likes
467

Hi

I am having different resources in a table.i want to calculate the time taken for the first resource and the second resource.i want to know the time taken between each resource.so i want to maintain them in a loop.can you please help me in guiding me.

Thanks & Regards

jyothi

3 REPLIES 3
Read only

Former Member
0 Likes
445

Hi,

I know some tansaction can help you to analyse the time in database: there are

SE30 and ST05.

i hope they help u.

Issam

Read only

0 Likes
445

hi

my problem is i am having a table with some resources i want to calculate the setuptime between the 2 resources.the resources examples is machines.so i need to calculate the setup time for each machine and display in a table.for that i created a table with these resources.but i am getting problem in calculating setup time bt 2 machines.

Best Regards

Jyothi

Read only

Former Member
0 Likes
445

use system variable sy-uzeit field ..