‎2007 Jun 01 8:07 AM
hi gurus,
URJENT could you give bussiness flow of PP. WITH TRANCTION CODES
‎2007 Jun 01 8:11 AM
Hi,
Refer to these links.
http://www.sap-img.com/pp009.htm
http://www.sapdevelopment.co.uk/tcodes/tcodes.htm
http://www.sap-img.com/general/find-the-list-of-sap-transaction-codes.htm
http://searchsap.techtarget.com/tip/1,289483,sid21_gci803893,00.html?bucket=ETA
www.erpgenie.com/sapgenie/docs/useful-tcodes.pdf
Thanks,
Anitha
‎2007 Jun 01 8:11 AM
Hi,
PP process flow
step 1: creation of master data (Material master,BOM,Work center,Routing)
step 2: Planning - can be done by Planned independent requirement (MD61), Independent requirement (MD81).
we plan for a quantity, on which date (it would be finish date).
step 3: MD04 -stock/requirement lsit (plan made can be viewed in MD04)
step 4: MRP run - MD01/MD02, PIR is converted into Planned order
step 5:Planned order to be converted production order - CO40, CO41
step 6: production order to be released - CA02
step 7: confirm the production order (order confirmation-CO15 (after which GI and GR is done)
http://www.erpgenie.com/sapfunc/pp.htm
T-Codes
C001 Create Production Order
C005N Collective Release
C011N Time Ticket
C012 Confirmation - Collective
C013 Confirmation - Cancel
C00IS Production order information system
C0GI Reprocess Goods Movements
C223 Maintain production version
Go through the below links,
http://help.sap.com/saphelp_47x200/helpdata/en/a0/20d634781a1b7ee10000009b38f83b/frameset.htm
Regards,
Priyanka.
‎2007 Jun 01 8:17 AM
Hi
There are 3 types of execution in PP
1.Discrete (PP-General), 2. PP -PI 3. Repetetive
for PP general and repetetive
the master data( MATERIAL MASTER,WORKCENTER,BOM AND ROUTING ) will be same and Planned order is converted to Production Order .
where as for PP-PI
Material master,Resource, Material List and Master receipe is the Master data and Planned order is converted into Process Order
In repetetive it is Period Based Costing and in other 2 it is Order based costing.
IImportant Tcodes:
CR01 -Work center create
MD01- MRP run
CS01-BOM
CA01 -Routing
CRC1 -Resource
C201 - Master Receipe
COR1 -Process order
CO01 - Production Order
Important tables are
AUFK,AFKO,AFPO,MDKP,MDTB,PLKO,PLPO,AFRU,AFVV,AFVC ETC
See this link for PP:
http://www.sap-img.com/sap-pp.htm
Check this link -
Reward points if useful
Regards
Anji