‎2005 Dec 15 7:26 AM
Our company just upgraded from 4.0b to MySAP ECC5.0. I found out that the existing material(Plant & Storage Location) are stored in EQUI table, however, when I created new material, Plant & Storage Location are stored in EQBS table, but the value is blank in EQUI table.
I just want to find out is there any convertion program available to insert data from EQUI table(old material) to EQBS table?
‎2005 Dec 15 12:52 PM
Hi!
There must be something else going wrong. I checked table EQBS (in 5.0), it's (only) key field EQUNR is linked to EQUI as check table.
Did you flag the 'crate equipment'-flag in main screen of ia02?
Regards,
Christian