Hi
I am assigning a variable size material component with item category R to a network activity using BAPI_NETWORK_COMP_ADD.
However, the BAPI is calculating incorrect variable size item Qty (ROMEN) even though the correct formula key, units and sizes are paased. The material master conversion factor is also maintained correctly for the material component.
Any possible suggestions or applicable notes for correcting the error is welcome.
Regards
Srikrishna.
Edited by: Srikrishna D on Jul 27, 2009 1:51 PM
‎2009 Jul 27 1:04 PM
Hi ,
Check this.
DE ROMEN
____________________________________________________
Short Text
Quantity of variable-size item
Definition
Quantity of variable-size item, which the system calculates from the sizes entered. If you wish you can enter a variable-size item formula for the. calculation.
The quantity of the variable-size item shown is per piece (PC)
Procedure
If you change a field that affects the calculation of the variable-size item quantity (for example, size or formula), the system only recalculates the quantity if you delete the existing quantity first.
To do this, delete the contents of the Qty Var-sz item field.
Examples
Size 1: 200
Size 2: 300
Size unit of measure: MM
Variable size item unit: SQM
Calculation of variable-size item quantity:
A = Size 1 * Size 2
A = 200 MM * 300 MM
A = 0,06 SQM
--> The variable-size item quantity for each piece is: 0.06 SQM
Dependencies
The value calculated is required in MRP, in order to calculate the total quantity of the raw material requirement for the component.
If 10 pieces are required for the component, the variable-size item quantity is: 10 * 0.06 SQM = 0.6 SQM.
‎2009 Jul 28 5:29 AM
Hi,
My doubt was not answered.You just told the functionality not the solution of the problem that I am facing
Regards,
Srikrishna