Hi All,I have a scenario where variable size item data differs at the time of the actual goods movement recording. In my example, i have component wire, with 1 dimension that is length.From the BOM, the planned length is 2000 mm length of 1 Piece of...
Hi all,I’m looking for a solution/work around for the below scenario related with variant configuration in steel roofing sheet manufacturing scenario.Variant configuration is used with length as parameter. (Customer specific length)Finished product i...
Hi All,This is regarding activating PPDS for SAP S/4HANA 2022 for Generic and variant segmented articles (S/4 Hana for fashion and vertical business)Getting below error when trying to activate advanced planning for generic or it’s variant article in ...
Hi All,
I have below requirement,
Crate HU
Crates HU are created to pack the finished materials quantities. A Crate can have multiple material codes and quantities.
Crate is created with pre-defined allowed material wise quantities to pack.
...
Hi All,
I'm facing an issue in activity recalculation to the yield +scrap entered in the order confirmation screen (CO11N). Activities have been recalculated incorrectly for some order confirmations causing huge variances
Below is an example, her...
Hi,Try testing your scenario using CO07, production order without material. In the component section you can add only the receiving component in negative (-) quantities (movement type will be 531). you can add a routing to capture any operations, wor...
Hi,For start you can refer the below help portal documentation on demand management, which includes planning strategies with sample scenarios.https://help.sap.com/docs/SAP_S4HANA_ON-PREMISE/eedc1019283a438a8b73fdde490abc4f/0f23bf53d25ab64ce10000000a1...
Hi,This could be achieved via SAP variant configuration functionality.Please refer the below for details on the concept. You can also research more on SAP variant configuration functionality in the community.https://help.sap.com/docs/SAP_S4HANA_ON-PR...
Hi, is this for SAP S/4 Hana? Because order creation can be also automated with creation of sales order with the planning strategy 82I have a doubt because in the diagram i see that it's not marked as (1).It may be also possible that the automation i...
I had raised an incident with SAP and got the confirmation that It is not possible to activate advance planning for the generic article and its variants. i.e. As per the current design the functionality is only applicable for single articles. This is...