Greetings,I am trying to prepare two variants of a report (Manage ** app) and I am having some issues.I prepare the reports, and I successfully save them as tiles and the tile quick info shows the correct result (6 and 122 - count of returned rows) ...
Greetings,we are using Manage Change Records app (APP ID F2097) to manage the process of master data changes. Amongst other we are managing material master data and we have an issue that when a change number is created it does not allow changes to ob...
Greetings,we are using SAP change requests from SAP MOC component as part of SAP EHS (environment health and safety). Based on the questions and answers to these questions we have prepared follow up activities which trigger additional objects creatio...
Greetings,we have defined a user status scheme for quality info records in procurement. This status scheme can be manually added to the info record.We add the status to the info record manually and we can manage it in QI02 transaction. But this funct...
Greetings,
I am trying to create a maintenance notification from a maintenance notification. I am aware of action box functionality and I have created an activity based on function module QM06_FM_TASK_CREATE_QM_NOTIFIC.
The notification is no...
Greetings,perhaps there is some way to develop but before you start any development it would be good to think about the process flow.You want to create an inspection lot without an planned event. In standard early inspection lot is created based on t...
Greetings,please refer to online process navigator. Some relevant scenarios in the Acquire to Decommission process are:4HH - Reactive Maintenance4HI - Proactive Maintenance43R - Maintenance Resource SchedulingBH1 - Corrective MaintenanceBH2 - Emergen...
Greetings,I don't think this is possible. In this scenario you would need to have two inspection lots with same origin created at order release. You could however have one 03 (in process) origin and one 17 origin (at goods receipt) but unfortunately ...
Greetings,this is read only information which is populated by data from notification which was created from the operation. Try creating a notification, maintain the reference techical object information and observe how this data will be populated.Bes...
Greetings,interesting. I can't think of anything, beside DMR, that would change inspection scope. Can you additionally check in transaction QDH2 if system returns any results for your material?Best regards, M.