Serge_Driendl
Explorer
Member since ‎2019 Apr 23

User Statistics

  • 18 Posts
  • 0 Solutions
  • 12 Kudos given
  • 9 Kudos received

User Activity

I wanted to create a major assembly project from an Enditem BOM with one major assembly material in the Shopfloor BOM (App F1813 “Maintain Bill of Material”). The step after would be the project generation.However the BOM header tab “Parameter Effect...
Correct network and thus project scheduling is of paramount importance in SAP PS, especially for complex project schedules like they often occur in ETO/CTO+ scenarios, like e. g. in mechanical & plant engineering or heavy industrial machinery project...
Hi there, confirmations with CAT2 are saved in "H" and confirmations with CN25 (Project System) are saved with "HRS". How can I replace the unit of measure for CATS? Someone posted the following answer, however I don't fully understand it. And...
Hello all, as my post is quite long: thanks in advance for the help! I currently have a small scheduling problem in PS (S/4 1909): I have a scheduled project in which the activity duration is shortened for an activity lying in the middle of the ...
Hello, the above stated function doesn't work the way I'd expect it to work for the Project System: The (collective) availability check sets a system status on the network, either MSPT (material shortage) or MACM (material committed) depending on...