Hi QM experts, I noticed that the stock relevant 01 inspection lot gets canceled when the GR is reversed in MIGO, although there is an outstanding QN against the 01 inspection lot. Is this a standard behaviour? Should there not be an error/warning ...
Hi, We are in a scenario, where we need Auto-UD and stock posting to happen on the inspection End date of the inspection lot. Basically, the stock needs to be available in Unrestricted after 5 days of GR (hence kept AID as 5). Pls advise. Note: C...
I have a sample drawing procedure X with the below data: Primary Sample: Size factor: 1; Size: P2Pooled sample: Size factor: 1; Fixed number : 1; Reserved sample: Fixed number: 2; Sample qty: 100 G There are three operations in my Inspection plan...
I have 5 tasks in my Deviation notification. I want one particular task to be made TSCO TSSC (Task completed and then made successful) status, else it should not allow the user to complete the notification. How do I achieve this?
Hi, SDP is maintained such that it should create Primary sample as per the formula (If P2<2 then P2, else round(sqrt(P2*0.4))), 1 Pooled Sample(fixed) and 1 Reserve sample(fixed). If the inspection lot quantity is 2 EA and...