aniket_gautam
Participant
Member since ‎2011 Sep 29

User Statistics

  • 109 Posts
  • 3 Solutions
  • 10 Kudos given
  • 0 Kudos received

User Activity

Hi Team, I want to reset the quality level to initial stage (QDL2)automatic ,whenever new production order gets create for the material. Is there any standard configuration through which this can be achieved.
Hi Expert, I have one Notification type which is being used by 2 plant,but there are using different code and code group for causes,item task, activities. In configuration we assign the catalog profile to notification type and this would display al...
Hi Team, We are working on QM EWM integration. We have in process (03lot) and post production lot (17 series lot). We are doing GR through EWM tcode (RF Transaction)pallet by pallet.So each time we do GR for pallet, inspection lot gets generate ...
Hi Team, We are working on 04 inspection type. When we do the GR for the production order through RFUI tcocde Inspection lot gets generated along with warehouse taks and stock move to quality. This is fine. But for the next lot which is SKIP, and g...
Hi Expert, Can we do auto UD base on in process inspection lot. suppose if 03 lot accepted then 04 lot for related to same production order will be accepted as auto UD & vice versa