Dear Experts,

While running background job we are facing one issue. Jobs gets finished after sometime without processing all records. i.e. if 200,000 records need to be processed, job process only 120,000 and ignores rest. status of job we can see in SM37 is "Finished". When we checked SM21, found that everytime when job gets finished, one system message gets issued with Error status. it seems work process is getting terminated after a time interval.

if anyone has any idea & solution about this issue. Please let me know.

I have tried to tag BASIS -TAG. in primary tag i could not find SAP-BASIS. i hope it will route to correct forum.

Regards,

Ashish T.

Accepted Solutions (1)

Accepted Solutions (1)

Sandra_Rossi
Active Contributor

You'll get more details in the developer trace (transaction ST11, look at the file dev_w40, as the workprocess is number 40).

https://help.sap.com/saphelp_nw70/helpdata/en/1f/8311664bc511d189750000e8322d00/frameset.htm

You may also search some information in SAP notes.

former_member212705
Active Participant
0 Likes

Sorry i was away for some days, Thanks for reply will check

Answers (3)

Answers (3)

Former Member

Work process might die because of many factors. One example, it will restart itself once it reaches the maximum allocated memory. In addition to Sandra Rossi's comment above, check the related logswith the same timestamp when the error occurred (ST22, SLG1)

former_member212705
Active Participant
0 Likes

Sorry i was away for some days, Thanks for reply will check

raquel_gomez
Product and Topic Expert
Product and Topic Expert

Hi Ashish,

SystemLog screenshot (SM21 transaction) shows BTC WP 40 dying on 05/05/2017 08:46:53.
To get more information, please provide WP40 trace file (dev_w40), containing information at that timestamp. This file should be located on work folder from affected server (/usr/sap/<SID>/<INSTANCE>/work).

Regards,
Raquel

former_member212705
Active Participant
0 Likes

Sorry i was away for some days, Thanks for reply will check

raquel_gomez
Product and Topic Expert
Product and Topic Expert
0 Likes

Hi Ashish,

Check the WP40 trace file at that timestamp 08:46:53.
Some lines before the WP is stopped, you should find the reason.
If not, attach complete trace file.

Regards,
Raquel
former_member212705
Active Participant
0 Likes

HI Raquel sure, i will inform Basis. Thanks a lot for you valuable time.

Former Member
0 Likes

Hello Ashish,


Is it possible to attach dev_w40 from 6/5/2017 at 08:46 time stamp here?

Also paste the "SM37 -> job log" details here.

Regards,
Manjunath Hanmantgad