cancel
Showing results for 
Search instead for 
Did you mean: 

SAP PI Dual Stack: Configure Specific Interface Message Retention

10-23-2018 2:00 PM
suwandi_cahyadi Contributor
719 views 1 comments Go to solution
0 Likes
SAP Managed Tags
Subscribe

Hello,

From notes 1960448 and this link:

https://help.sap.com/saphelp_nw73ehp1/helpdata/en/66/ca97663c22403cb111a28cc88027d9/frameset.htm

It is said that we can set the retention period for specific interface. But when I go to the SOA > Monitoring menu, there's no "Message Retention" option. Is it because the PI version is below 7.5 sp07? Or is it because this feature is only available for single stack PI?

Another question is that, will the retention period configure there will affect the retention period in ABAP stack for Dual Stack PI system?


Thank you.


Regards.

0 Likes

Accepted Solutions (1)

Accepted Solutions (1)

former_member190293
Active Contributor

Hi Suwandi!

Did you check wheither your PI system meets the requirement mentioned in above note:

The function is available since SAP NetWeaver Process Integration 7.31 SP12 and 7.40 SP07

Regards, Evgeniy.

Answers (0)