on ‎2007 Jan 31 1:53 PM
Hi,
I have 2 JOB scheduled on transaction SCOT (and SM37).
This JOB are:
NOTESCONNECTEXCH
SAPCONNECTEXCH
both are related to the program RSCONN01
I have noticed that every job is scheduled every 1 minute and every time this job run, create a log into directory:
\usr\sap\SID\SYS\global
The log file name start with WF_LOG_xxxx
Due to the frequency of the job a lot of LOG is created on server and sometimes I have some DISK space problem and some ABAP DUMP (related to missing space on disk!).
My question is:
is it correct to schedule this job every minute and how I can do for do not create the log at every run?
Regards
Request clarification before answering.
Hi Cocco,
RSCONN01 starts the sapconnect send process.I dont think it should scheduled to run every min rather i would say every 10-15 mins.But it depends on your business and how fast you want to send out the mail from SAP. The log WF_LOG_xxxx is related to workflow i think
Thanks
Prince
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 9 | |
| 7 | |
| 7 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.