on ‎2024 Jun 26 12:21 PM
Friends, As part of RISE, with embedded set up [ S/4 ECC, GRC, BW etc ] can only DB refresh of GRC non - production system be performed without refresh of S/4 ECC and BW.
Please let me know.
Thanks
Raj
Request clarification before answering.
Hello Raj,
Please check your GRC deployment model as per SAP Note 2229853 - GRC and S/4HANA oP: compatibility information - SAP for Me. Refresh of GRC non-production is possible only in the side-by-side deployment scenarios. If co-deployment/embedded model is used, then S/4HANA and GRC would be on the same database and it is not possible to refresh just the GRC part using standard refresh procedures.
Thanks, Kishan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 3 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.