Hi All,

i want to transport below objects.

2 Multiproviders,2 cubes,1 infoset,2 DSOs,few transformations(changes in end routine/fields),few DTPs,2 data sources,few infoobjects,2 infopackages.

I want to collect all of them manually in a transport request 1 by 1.Request already exists.

How can i do this and should there correct be a sequence/order of collection of above objects?

regards,

s

Accepted Solutions (0)

Answers (4)

Answers (4)

RamanKorrapati
Active Contributor
0 Likes

hi sushant,

no need to worry about sequence, you can collect all under one request thru Transport connection in RSA1,

collect all objects which you want transport, click on transport icon, red bus, will pop up with $tmp, change to custome defined one/own request. afther that go to SE09, releast child task and then parent request. go to target system import it by using t code STMS in source(i.e Qa or prod).

http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/9017aca4-ecc3-2e10-2492-a9b2c765c...

http://www.scribd.com/doc/6412409/How-to-Manage-BW-Transports

http://help.sap.com/saphelp_nw04/helpdata/en/0b/5ee7377a98c17fe10000009b38f842/content.htm

Thanks

Former Member
0 Likes

Hi,

One more option for the same scenario is :

Select that Newly added object 1 by 1 in RSA1  --> Click on extras --> object directory Entry

in that change package temp to BI related package and automatically its will ask for ur transport request ... u assign ur respected request to that object

Regards,

Kavita

Former Member
0 Likes

hi Hendrik,

thanks for quick updates.

yes there is 1 transport request.

2 data sources,2 infopackages,2 transformations involving these 2 data sources and few infoobjects are newly created.Rest all objects are already existing and hence modified.

So what steps i can follow now to collect all and about the sequence

hendrik_brandes
Contributor
0 Likes

Hello Sushant,

it is very easy: Goto RSA1 -> Transport Connection.

Then choose under "SAP Transport" -> Objecttypes. In the screen, a list of object types should appear. There you will have to select all of your objects, whose you want to transport.

Select them and add them to your transport request. A sequence is not necessary. Additional: The transport connection selects all objects which are related to your selected objects.

Kind regards,

Hendrik

Former Member
0 Likes

Hi Sushant,

Sequence doesn't matter here.

The method execution part while you transport, takes care of this based on the object hold in your transport request.

Br,

H

hendrik_brandes
Contributor
0 Likes

Hello Sushant,

you can do this via RSA1 -> Transport Connection. There you have to select your objects and pack them to your existing transport request. I understand, that you will have 1 transport request. If all of your objects are new, there is no sequence to respect.

If you are changing different objects, you will have to check, that they can be overwritten in the destination system. After importing you will have to check if several objects, which are influenced by your objects are inactive. If this is the case, you will have to activate them manually or import them again in active version.

Kind regards,

Hendrik