In the PM (Plant Maintenance) module of SAP S/4HANA 2022, I've encountered an issue where, after performing a technical completion (TECO) on a maintenance order, the associated purchase requisition (PR) no longer appears in the document flow. In previous versions, the purchase requisition would still be visible in the document flow even after the maintenance order was technically completed.

  • Is this change in the document flow display after TECO a standard behavior in SAP S/4HANA 2022?
  • Is there any configuration setting that controls the visibility of purchase requisitions in the document flow after a maintenance order is technically completed?
  • How can I ensure that the associated purchase requisition remains visible in the document flow after TECO?

I would appreciate any insights or guidance from the community experts. Thank you very much!

0 Likes

Accepted Solutions (0)