on 2026 Jan 07 9:25 AM
what is the Concept of material Staging in Goods issue posting?
Request clarification before answering.
Dear @Ibrahim_Samir47,
In Public Cloud material staging is the internal replenishment step that makes sure production components are physically and system-wise available at the issue point (production storage location / Production Supply Area) before you post the goods issue (GI 261) to the production order for consumption
What material staging means:
More details below:
There are two often-confused GI „moments”:
1. GI for staging (replenishment / transfer posting)
This is the posting that finishes staging by transferring stock to the production storage location / PSA often via delivery/warehouse execution if WM is involved. In delivery-based production integration, once staging is completed GI is posted for the outbound delivery and the components are transferred to the production storage location and become available for consumption
2. GI to the production order (GI 261- consumption)
This is the real consumption posting that reduces inventory and posts the component cost to the production order. In Public Cloud you can do this:
More details below:
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer/#/detail/Apps('MIGO')/S35
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer/#/detail/Apps('CO27')/S35
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer/#/detail/Apps('CO11N')/S35
https://fioriappslibrary.hana.ondemand.com/sap/fix/externalViewer/#/detail/Apps('CO11N')/S35
Common staging approaches in Public Cloud:
More details below:
Summary:
Best Regards,
Dawid
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 9 | |
| 7 | |
| 6 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.