Hi all,
we have ECC sandbox & ECC PROD system. Both having same SID. While LMDB configuration the following SID assigned automatically.
SANDBOX: BPS
ECC PRD: BPS001
We have completed ewa configuration of both system. But ECC PROD also generating report under SID of BPS. I mean its generating report of SANDBOX.
How its possible? Tried lot of possibilities.
Please suggest.
nethaji
Request clarification before answering.
Hi All,
Getting the EWA report of sap machine having same SID is not possible one.
What i have done, I have deleted the sandbox details in LMDB,SMSY & managed system configuration.
Now i am getting a report of ECC- PRD.
We need to change the SID of any one machine. then only we will get a report.
Please go for SAP SID conversion procedure to change the SID.
nethaji
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.