Hi
We are performing technical upgrade from 3.5 to Bi7.3.
Does the sap upgrade installation allows the system to be upgraded directly from BW 3.5 to BI7.3 or is it a mandatory requirement to first upgrade to BI7.0?
Appreciate feedback from anyone who could assist in this.
Thank you.
Regards
Maili
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All :
We also plan to upgrade BW 3.5 to BI 7.3. My qusetion is taht If we upgrade BW 3.5 to BW 7.3, do we need to modify all BW 3.5 objects to BW 7.3 (Native mode)?. Can we keep runing BW object in BW 3.5 mode? How isit running performance in BW 3.5 mode? is it same with BW 7.3 native mode ?
Need your kindly sharing. Thanks !!
Lawrence Kuo
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Lawrence,
upgrade 3.5 -> 7.3 is feasible however there are some activities that you have to done e.g. new authorization concept is mandatory you cannot run 7.3 in old (3.x) concept. See above in this thread.
Regarding 3.x BW objects: all is still supported. When 7.3 was released SAP said that you won't be able to modify those object. Means only runtime of those object will be supported. However modification of those objects is still possible at least to Support Pack level 04 of 7.3. From performance point of view I didn't experience anything wrong. You just miss new functionalities if yo do not migrate your data flows to 7.x style.
BR, Martin
Basically upgrade from 3.5 to 7.3 is possible. But you need to be aware that as new (7.x based) authorization concept is mandatory. this means that during the upgrade you must to switch to new concept. As for sure you will have no new roles already prepared then you won't be able to run any authorization checks...system will be opened...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Martin.
As you said, after upgrade we won't have any new concept roles prepared beforehand, so I guess that after development upgrade we have to do the conversion to new concept, and transport the new objects to quality and production systems when these are upgraded too. Am I right? Or there are other approach?
And about authorization variables in queries? Any changes on it?
Thank you
Henrique
Maili,
I am also doing a BW3.5 to BW7.3 upgrade and wondering if you have a project plan I could leverage.
Sorry to impose like, however I am at a disadvantage since I never did a BW upgrade before.
Would you be able to assist?
Thanks so much.
Russ Smith (Chicago)....
C 847-910-8360
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In one of the threads, I read that you need to have 7.0 authorization concept in order to upgrade to 7.3.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.