cancel
Showing results for 
Search instead for 
Did you mean: 

BO migration

06-28-2022 11:02 AM
815 views 2 comments Go to solution
0 Likes
SAP Managed Tags
Subscribe

Hi All,

I am doing BO migration, just wanted to confirm one thing as we have 3 boxes in Dev env, 2 boxes installation and configuration is done and third box we are facing some issues so not started installation & configuration.

My query is can we start migration with 2 boxes without any issue and once 3 box installation /configuration done we can add it after migration.

Regards

0 Likes

Accepted Solutions (1)

Accepted Solutions (1)

shiva_vishnubatla
Product and Topic Expert
Product and Topic Expert
0 Likes

[Edited] Yes. you can migrate the content over with two nodes and add the third node. You could install BI (same version patch level) on this node whenever it is ready by choosing expanded install option and point the node to the first CMS in the DEV environment and it gets added post install.

former_member777429
Participant
0 Likes

Thanks Shiva

Answers (0)