on ‎2011 Mar 31 12:15 PM
Hi
I have some question:
Is it possible to integrate BMC Control M with Solution manager?
Is SAP have plugin or we need to develop?
If we integrate then what is the benefit?
Please guide me.
Thanks
Dee
Request clarification before answering.
As Matues has provided that BCM Control-M is a supported job scheduling tool
Further to answer your question SAP Note 499040 explains that XBP interface is required for external job scheduling tools
You will find several documents that describe the XBP interface in detail at
http://www.sdn.sap.com/irj/sdn/nw-scheduling.
So you will need to use this interface to use the external job scheduling tool
Regards,
Paul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
A list of SAP Certified XBP Partners (i.e. certified external job schedulers) are as follows:
1. Computer Associates (Autosys)
2. BMC (Control M)
3. Hitachi (JP1)
4. IBM (Tivoli Workload Scheduler)
5. ICSI
6. Nomura Research Institute
7. Orsyp ($Universe)
8. Redwood (Cronacle)
9. SMA
10. Stonebranch (Universal Connector for SAP R3)
11. Tidal Software
12. UC4
I ask you to check the pdf inside of this note below. They have some instructions to BMC COntrol M.
Number 837691
Short text Background jobs are deleted in unintentionally
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 15 | |
| 9 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.