cancel
Showing results for 
Search instead for 
Did you mean: 

Blueprint phase

03-30-2007 4:24 PM
3543 views 4 comments
0 Likes
SAP Managed Tags
Subscribe

Hello gurus,

could u please brief me about designing phase of a project and send me the links of any documentation for this.

please send me the links regarding blueprint phase of a project too, will surely award points.

regards

0 Likes

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Likes

SAP Implementation Phases.

Project Preparation

In this phase you plan your project and lay the foundations for successful implementation. It is at this stage that you make the strategic decisions crucial to your project:

Define your project goals and objectives

Clarify the scope of your implementation

Define your project schedule, budget plan, and implementation sequence

Establish the project organization and relevant committees and assign resources

Business Blueprint

In this phase you create a blueprint using the Question & Answer database (Q&Adb), which documents your enterprise’s requirements and establishes how your business processes and organizational structure are to be represented in the SAP System. You also refine the original project goals and objectives and revise the overall project schedule in this phase.

Realization

In this phase, you configure the requirements contained in the Business Blueprint. Baseline configuration (major scope) is followed by final configuration (remaining scope), which can consist of up to four cycles. Other key focal areas of this phase are conducting integration tests and drawing up end user documentation.

Final Preparation

In this phase you complete your preparations, including testing, end user training, system management, and cutover activities. You also need to resolve all open issues in this phase. At this stage you need to ensure that all the prerequisites for your system to go live have been fulfilled.

Go Live & Support

In this phase you move from a pre-production environment to the live system. The most important elements include setting up production support, monitoring system transactions, and optimizing overall system performance.

https://sapmats-de.sap-ag.de/download/download.cgi?id=YCFD19RWCVGWEOBJ1Z0CHVXOACGDMIBO6JM7IWQJNZV7T6...

Hope it Helps

Chetan

@CP..

Former Member
0 Likes

Thank you so much for your detailed answer Chetan.

I have another question though, how different is a functional spec from a technical spec. Are there any specific documents which talks about this, would appreciate if you can give me some tips.

Thanks

Khanna

Former Member
0 Likes

Hello Khanna,

Try the link below and download ASAP documentation or Roadmap. There are many kinds of template.

www.service.sap.com/bi

Follow:

->Services & Implementation -> SAP BW ASAP

Refer this also

/message/1865271#1865271 [original link is broken]

Check this post for blue print:

/message/1447350#1447350 [original link is broken]?

Regards

Kiran

Message was edited by:

ravi kiran naalla

Former Member
0 Likes

Some Easy Tips & Check List

Functional requirements should cover minimum of the below check list

Business Objectives and Benefits

Business Scope and Events

Business Process Scope

Future state process improvements

Business KPI s

Reporting Requirements

System/Client Strategy Interface Requirements

Source System Mapping

Field availability (Master data + Transaction data)

Transformation details

Data availability frequency

Data availability type

System availability and Outage window

Data load dependencies

History Data Load availability

Data Volume

Data Reconciliation

Data retention

Contingency Planning

Authorizations

Transport Strategy

Capacity /Resource Planning

Gap Analysis

Integration and Policy/SOX consideration

Support – Service Level support /Production support

Change Management

Technical requirements - Take a BI report ,translate functional requirements in to technical design.

Map KF ,Charecteristic,Free Char,RKF,CKF ..

Hope it Helps

Chetan

@CP..