Hello guru,
I am currently using discrete manufacturing scenario. and in that process i am producing jigs without BOM and ROUTING. i have made a dafault operation with work center using OPJG and i consumed material manually while confirmation using co11n.
now what i am facing problem is that if suppose i am producing lets say ABC material and if standard price is 100 and moving price is 88 with price control S. so when ever we confirm material ABC is cost is showing 100 which is right but when we wants to reverse that confirmation price is reverse from moving price that is 88 rupees.
Note that when i confirm using co11n i am not issue and material i.e 261 is not happen only activity is posted and 101 happen for finished material i.e ABC.
Regards
Nitesh...
Request clarification before answering.
Hello Nitesh,
Please check and apply SAP note "200159 - Note 119046: standard price control " in your system and check if it solves the problem.
As per your description of the problem, the symptom matches the note details, so please check with help of your BASIS team and apply the note.
Post application of the note please confirm if the issue is solved.
Best Regards,
Ameya Beri
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Nitesh,
Sorry, I mean the second line ( which is +100).
I know you are not changing the map price. The map will be updated automatically by several transactions. one of the transactions that can update it is settlement. If you settle the variance to the material, then the map will change, even though you are using standard price control.
If that is the case, perhaps you can change the settlement to other cost object such as cost center, then the map will still be 100.
Regards,
Hengky
Hi Nitesh,
In asap question indicating two areas 1. Materials 2. Activities conformation
1. Materials
Both are different but in your point total cost of material should be reversed from production order.
For that you can you mb31 mvmt 102, order XXX, plant: XXX and sloc: XXX.OR you can use migo good receipt mvmt 102 with same parameters like above ,. so that cost will be back from production order.
If your question is resolved pls close the thread.
Regards,
@KRK @
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hello ravi sir,
sir what i am trying is that i am confirming a material using co11n without any activity and component
and when i see cost report it will show 100 rs for 101 of that material and when i cancel or reverce using co13 or mb31 the cost is not reverce 100 is will reverce 96.01 that is MAP price how can i solve it.
Hi Nitesh,
If the material is semi finished or finished, the price control should be S. it seems that you have used the price control V.
The system is doing correct. because you are not reversing the movement but you are cancelling the document.
to change the list of documents which change the price you can use CKMPCSEARCH
Regards,
Solomon
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 53 | |
| 29 | |
| 21 | |
| 10 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.