pull list cannot be generated for a process order in T-code :MF60

11-08-2018 3:52 AM
1723 views 2 comments
0 Likes
SAP Managed Tags
Subscribe

Dear All ,

I will first introduce the background of the problem.

there are 2 storage location managed by the same plant .

all materials are stored at the main stroage location . but process order 261 goods issue takes place at the WIP stroage location.

And the two stoage locations enable the WM module, and the main stroge location has the active HU function.

we are planning to use MF60 to stage material againsta process order.

However, after entering the process order number, no material information is displayed in the output view, even though the order has a shortage.

The screenshot below:

How to solve this problem ?

0 Likes

Accepted Solutions (0)

Answers (2)

Answers (2)

lingaiahvanam
SAP Champion
SAP Champion
0 Likes

Hi Sun,

Did you enable WM-PP interface to stage materials from the main storage location to production storage location?

Process Flow:

1. You create a production order

2. Release the production order

3. The system determines the material staging type on the basis of the control cycle and determines the production storage bins, in which the components should be staged

Prerequisite for Pull list -

The issue storage location should come from the master data to the dependent requirement which has come from the planned order. Issue storage location needs to be maintained in BOM or Material master.

Best Regards,

Lingaiah

kumar_semmalai
Active Contributor
0 Likes

Hello ,

Since your materials are managed in WM level, have maintained the Relevant Control cycle ?.

also please remove the date from Selection Horizon for Reqmts and try it..

Best regards,

Kumar Semmalai