Dear All ,
I will first introduce the background of the problem.
there are 2 storage location managed by the same plant .
all materials are stored at the main stroage location . but process order 261 goods issue takes place at the WIP stroage location.
And the two stoage locations enable the WM module, and the main stroge location has the active HU function.
we are planning to use MF60 to stage material againsta process order.
However, after entering the process order number, no material information is displayed in the output view, even though the order has a shortage.
The screenshot below:




How to solve this problem ?
Request clarification before answering.
Hi Sun,
Did you enable WM-PP interface to stage materials from the main storage location to production storage location?
Process Flow:
1. You create a production order
2. Release the production order
3. The system determines the material staging type on the basis of the control cycle and determines the production storage bins, in which the components should be staged
Prerequisite for Pull list -
The issue storage location should come from the master data to the dependent requirement which has come from the planned order. Issue storage location needs to be maintained in BOM or Material master.
Best Regards,
Lingaiah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello ,
Since your materials are managed in WM level, have maintained the Relevant Control cycle ?.
also please remove the date from Selection Horizon for Reqmts and try it..
Best regards,
Kumar Semmalai
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 13 | |
| 7 | |
| 7 | |
| 5 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.