Hi

Can any one give dtails of Configuration and Tcodes for PP-Pi

regards

0 Likes

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Likes

Hi,

Pls. find PP-PI Tcode list as below :

PP-PI TCODES:

CRC1 - Create Resource

CR24 - Create Resource Network

CR31 - Create Hierarchy

C201 - Create Master Recipe

C251 - Print Master Recipe

C223 - Maintain Production Versions

COIO - Order Info System for PP-PI

COPD - Print Process Order

COPI - Print Process Order ShopFloor Papers

COR1 - Create Process Order

COR5 - Collective Process Order Release

COR6 - Single Process Order Confirmation

COR6N - Single Screen Entry of Confirmations

COR7 - Convert Planned Order to Proc. Order

COR7_PC - Part.Conv.: Plnned Ord. to Proc.Ord.

COR8 - Coll.Conv.: Plnned Ord. to Proc.Ord.

CORK - Process Order Confirmations (Total)

CORM - Mass Processing

CORO - Create Process Order w/o Material

CORR - Collective Entry of Confirmations

CORS - Cancel Process Order Confirmation

CORT - Display Process Order Confirmation

CORZ - Process Order: Time Event Confirmat.

COA6 - Process Order: Archiving

COA7 - Process Order: Retrieval - Archive

COA8 - Process Order: Archive Management

CO56 - Display PI Sheet

CO58 - Maintain PI Sheet

CO59 - Delete PI Sheet

CO60 - Find PI Sheet

COPOC - Process Manufacturing Cockpit

CO53 - Control Recipe Monitor

O10C - Assig. Ctrl Rec. Dest./Proc. Instr.

O12C - Assign Charact. / Proc. Instr. Cat.

List of PP-PI Transport Request and their IMG Path :

1) Define Distribution Keys

IMG > Production Planning for Process Industries > Master Data > Material List > Item Data > Item Data from related areas > Define Distribution Keys

2) Determine Person responsible for Resource u2013

IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Determine Person responsible

3Define Planner Group-

IMG > Production Planning for Process Industries > Master Data > Master Recipe > Define Capacity Planner

4) Define Capacity Planner u2013

IMG > Production Planning for Process Industries > Master Data > Resource > Capacity Requirement Planning > Determine Capacity Planner

5) Determine Standard Value Parameter u2013

IMG > Production Planning for Process Industries > Master Data > Resource > General Data > Standard Value > Define Parameter

6) Define Setup Groups and Setup Group Categories

Define set up groups and set up categories u2013

IMG > Production Planning for Process Industries > Master Data > Master Recipe > Data for operations and phases > Define set up groups and set up group categories

7) Define copy setting between plants-Process

IMG > Production Planning for Process Industries > Process Management > Tools > Define copy setting between plants

😎 Define Set Up Control Recipe destination u2013

IMG > Production Planning for Process Industries > Process Management > Control Recipe/PI sheet > Set up control recipe destination

9Define MRP controller u2013

IMG > Material Management > Consumption based Planning > Master Data > Define MRP controller

10) Special Procurement u2013

IMG > Material Management > Consumption based Planning > Master Data > Define Special procurement types

11) Define Floats (Scheduled Margin Key)-

IMG > Material Management > Consumption based Planning > Planning > Define Floats (Scheduled Margin Key)

12Define Splitting of Forecast requirements for MRP-

IMG > Material Management > Consumption based Planning > Evaluation > Forecast > Define Splittng of forecast requirements of MRP

13) Maintain Correction Factors for Forecast

IMG > Material Management > Consumption based Planning > Planning > Procurement > Maintain Correction factors for forecast

14 Carry Out Overall Maintenance of Plant Parameters

Maintaining plant parameters in MRP u2013

IMG > Material Management > Consumption based Planning > Plant Parameters > Carry out overall maintenance of plant parameters

15) Define Planning Horizon

Define Planning Horizon u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define Planning Horizon

16) Activate Requirement Planning u2013

IMG > Material Management > Consumption based Planning > Planning > Activate Requirement Planning

17) Define Range of Coverage Profiles (Dynamic Safety Stock)

Range of coverage profile u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Define range of coverage profile (Dynamic Safety Stock)

18) Define Stock in Transfer and Blocked Stock Availability

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Stock in transfer and blocked stock

19) Define MRP Areas

IMG > Material Management > Consumption based Planning > Master Data > MRP areas > Define MRP areas

20) Carry out maintenance of MRP groups

IMG > Material Management > Consumption based Planning > MRP groups> Carry out maintenance of MRP groups

21) Define Scope of total Planning - MRP

IMG > Material Management > Consumption based Planning > Planning > Define Scope of total Planning

22 Define Order Types

Define Order Type-

IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type

23Define Order Type Dependent parameters u2013

IMG > Production Planning for Process Industries > Process Order > Master Data > Order > Define Order Type Dependent parameters

24) Define Production Scheduler u2013

IMG > Production Planning for Process Industries > Process Order > Master Data > Bill of Material > Define Production Scheduler

25 Define Checking Control - Process Order

Define Availability Check u2013 Define Checking Control u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking Control

26) Define Checking Rule for backorder processing u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Availabilty Check > Define Checking rule for back order processing

27Define Stock and batch determination for good movement u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Define Stock and batch determination for good movement

28) Specify Scheduling Parameters

Specify Scheduling Parameters u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Specify Scheduling Parameters

29) Define Reduction Strategies

Define Reduction Strategy u2013

IMG > Production Planning for Process Industries > Process Order > Operations > Scheduling > Resource data > Define Reduction Strategy

30) Define Confirmation Parameters

Define Order Confirmation u2013

IMG > Production Planning for Process Industries > Process Order > Operations >

Confirmation > Define Confirmation Parameters

31) Define Valuation of Goods Received

Define valuation of goods receive u2013

IMG > Production Planning for Process Industries > Process Order > Integration > Define Valuation of goods received

32) MRP creation indicator u2013

IMG > Material Management > Consumption based Planning > Planning > Define creation indicator

33) Define safety stock u2013

IMG > Material Management > Consumption based Planning > Planning > MRP calculation > Stocks > Define Safety Stocks

34) Define alternative determination of Production u2013

IMG > Production Planning for Process Industries > Process Order > Operations > BOM selection > Define alternate determination of production

35) Define no. ranges u2013

IMG > Production Planning for Process Industries > Process Order > Master data > Order > Number Ranges > Define number ranges for orders

HOpe this helps.

Reward if useful.

Regards,

Tejas

Edited by: Tejas Pujara on Jul 24, 2008 9:22 AM

Answers (1)

Answers (1)

rupesh_brahmankar
Active Contributor
0 Likes

Hi,

In adding to above with nutshell,

Start with Enterprise hierachy for PP.

Under Logistics Create/Copy Plant ,Locationns

Maintain Plant parameters

Manitani Production Data for BOM

Then configure PP-PI

Sales Planning

Production Plan

MRP

Capacity planning

Production Campaign

Process Management

Then u can start configuring the Basic data ( BOM, resource, master recipe and PP-PI related datas)

Regards,

R.Brahmankar