on ‎2012 Aug 10 5:12 AM
Hi,
Can you please tell what are configuration and transactional setting required for parallel sequence? Also let me know the process flow for the same.
Regards,
Pragalathan.S
Request clarification before answering.
Dear,
Please search in forum you will get lot of stuff for same, refer below link
http://scn.sap.com/thread/1295378
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Refer the links and use the search option in the forum before posting the thread. This is answered several times.
No settings required, you have to mention it in routing. Mention parallel sequence in routing, go to sequence tab and click on the create and try. You only come to know, how to maintain it.
Then create order on this and check the behavior. Any doubts the post the question.
Regards,
Sharat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pragalathan,
I believe, you are talking about Parallel Sequence of operations in Routing and for that no specific configuration required... it's just creation of parallel sequence in routing with relevant operations.
You may want to refer below links for more details:
http://help.sap.com/saphelp_46c/helpdata/en/b1/c042f8439a11d189410000e829fbbd/content.htm
http://help.sap.com/saphelp_45b/helpdata/en/03/bb1d0ca6e811d189010000e8323492/frameset.htm
Example link:
http://help.sap.com/saphelp_40b/helpdata/en/aa/06c8bf514611d18a180000e816ae6e/content.htm
Regards,
Anup
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 23 | |
| 12 | |
| 9 | |
| 7 | |
| 5 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.