Hi,
I need to create two operation in parallel but I cannot achieve it.
First of all I create the routing with three operations as show in the image:
Then, I create a new sequence in parallel as shown:
But when I create a production orden, the production times are not the same for both operations.
¿How can i do to create a routing with two operation thar works at same time?
Thanks.
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello
Pay attention on the value selected for the field "alignment key" on the sequence detail.
If you want to have both operations starting on the same time, you should set the value 1 for this field.
The following link explains this setting in more detail:
Alignment Key in Parallel Sequences - Routings (PP-BD-RTG) - SAP Library
BR
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 14 | |
| 12 | |
| 7 | |
| 6 | |
| 5 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.