MRP Controller issue

sushant_wanjari
Contributor
0 Likes
3,521

Hi,

How is a user assigned as MRP controller and, what are the specific customization / master data settings done?

I know that MRP controller is defined in customization for each plant and is assigned in the material master.

I want to know how a person who is assigned as MRP controller can log into the system and know what all material he has to plan and check the procurement proposals for those materials.

please give specific answers. thanks.

Sushant

View Entire Topic
Former Member
0 Likes

Hi Sushant,

The MRP-Controller references are used in SAP to indicate responsibility/ownership for a group of materials, specifically in relation with the follow-up on the outcome of material-requirement-planning calculation (MRP-run).

In T-code SPRO the MRP-controller-codes are created in table V_T024D

The MRP-Ctrl-records will typically contain information on Plant/MRP-Ctrl code/MRP Controller name (full name)/ Recipient-name (this field can be filled with the SAP user-name) /Tel.number/Purchasing-group/Business-area/Profit centre.

In the MRP-1 view of the material masterdata records a relationship is created between the material-record and the MRP-controller (=responsible) for a particular material. On a regular basis a material-requirement-planning-calculation (MRP-run) will be made to balance supply and demand for the materials for an organization. The result of the MRP-run will be visible in SAP as planned purchase-requisitions, planned production-orders and action-messages in T-code MD06.

Through their relation with a material-record, these planned purchase requistions, planned production-orders and the exception-report-messages will also be tagged with the MRP-controller code.

The exception-report shows traffic lights and "exception group-codes" per mrp-group/plant/material/mrp-controller/vendor to indicate which action need to be taken (other selection-restrictions are also available in MD06). A drill-down on the materialnumber will bring the information of MD04 and will give access to stock-information / purchase-requisitions / open purchase-orders / planned orders / production-orders. T-code MD06 provides an action-list for the MRP-controllers / procurement-officers / production-planners. The MRP-Controller will decide to release the planned requisitions (for purchase-items)/ release planned production orders (for production-items) and will take action upon the information in T-code MD06 to expedite, postpone, change or cancel material-requirements. SAP allows an individual release of planned purchase-requisitions with T-code MD14; T-codes ME54N and ME55 support collective releases of the purchase-requisitions.

The release of individual planned production-orders can be done in T-code CO02 (or as a drill-down from report CO26 to CO02 )

A collective planned production-order release can be made with T-codes COHV and COOIS

Hopefully it is clear now that the MRP-controller-code is in no way the equivalent of the SAP-user-account and cannot be used to log-into the system or to log material-movements,

It is used as an additional identifier to make usefull selections in MRP-related transaction-screens and to indicate responsibility/ ownership