on ‎2014 Nov 21 7:12 AM
Request clarification before answering.
Hi Jolin,
In your case backward scheduling is failing due to some parameters like pickpack time, loading time,
transit time or transportation lead time but system should propose 24th as delivery creation date but idont know why it is not proposing. please share scheduling dates screen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
check your Backorders in V_RA
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pls find below screen, my material is make to stock strategy group, MRP3: total replenish lead time is zero. sales order 508, creation date: Nov.24, request delivery date is 25.Nov, qty: 3KG, why my confirmed date is Nov.27? how it is calculated? as my material strategy group is make to stock, why sales order affect requirement?
The requested delivery date is the date by which the customer expects the stock at their location/ unloading point. The material availability date is key for creation of delivery note. Prior to this material availability date, system will not allow us to create the delivery note. Please check the scheduling dates in the sales order schedule lines.
I changed the quantity from 3 to 1, however, VL01N selection still based on today's date Nov.24, I am able to create the delivery,(funny, which is wrong), material availability date is Nov.27
My first question is also not addressed, my total replenish lead time is zero in material master, siva suggested looking at shipping ppint delivery schedule time, which is four hours.
this customer in USA, our route by air takes four days, so material avalilability is supposed to be Nov.24+4 hours or Nov.24+4 hours+4 days?
As the RLT is zero for this material...the material will always be considered as available (even though physically stocks are not available) and hence in this case, the material availability date should be 24th only. Please post the screen print of the scheduling dates of the sales order item.
Hi Jolin,
You have shared the schedule line screen shot.
Here people are referring to Shipping (Scheduling) Dates screen shot of confirmed schedule line.
In your case, select second (Confirmed) schedule line i.e 27.10.2014- 3 or 1 Qty and click on Shipping tab down.
And share this screen shot with us to proceed further.
Thanks.
Regards,
Praveen Bodduna
Hi Jolin,
Please check whether any open Sales orders or Open Deliveries are exist for this material.
Thanks.
Regards,
Praveen Bodduna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 59 | |
| 30 | |
| 21 | |
| 11 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.