Hello,

Could somebody explain what does the field tolerance data from work scheduling do?

The material in the picture is a finished product.

Thanks!

Accepted Solutions (0)

Answers (1)

Answers (1)

ibrahemy
Active Participant
0 Likes

Hi,

Under delivery:

Status DLV will not updated in Process/Production order if GR Qty from process/production order lies under % tolerance
EX:

FG=100 KG

Under delivery 10%

If GR= 0-89 Order status updated with status PDLV (Partial Delivery)

if GR =90-100 Order status updated with status DLV (Delivery complete)

Over delivery:

Error message raised while doing GR

EX:

FG=100 KG

Over delivery 10%

If GR= 100-110 No error message (Within Over delivery tolerance)

if GR more than 111 error message raised (Exceed Over delivery tolerance)

BR