on ‎2023 May 10 2:31 PM
Where does SAP S/4HANA store the low-level code used to determine the sequence in which
materials are planned during the MRP run?
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In general, components with lower low-level codes are more critical for the production process and have a greater impact on the overall availability and scheduling of the finished product.
So which of the below three low-level code are used to determine the sequence :
Bill of material
MRP planning file
Material master
| User | Count |
|---|---|
| 24 | |
| 22 | |
| 17 | |
| 17 | |
| 10 | |
| 9 | |
| 6 | |
| 5 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.