Dear Sapients,

Case: We are creating a test case using single material for which "Control code" is already maintained in material master,

But while creating PO, we yet getting a system message pop-up, HSN Code is not maintained.

And

even we tried maintaining manually in PO, but control code option is grayed out in Item detail Tab: India tab

Would any one let us know the reason for the same ? and suggest a solution for this ?

Thanx in advance

regards

Nagaraj

Accepted Solutions (0)

Answers (2)

Answers (2)

JL23
Active Contributor
0 Likes

see this OSS note to know what you have to do to get the control code into the purchase order: 2474348 - GST India - Control code field value is not autopopulated from material master under INDIA...

However, I wonder what error message you get, what is the message number?

SivaPrasad_Vasireddy
Active Contributor
0 Likes

Hi,

let me know where did you maintained the HSN code

this need to be maintained under Foriegn Trade Data

Former Member
0 Likes

Hi Siva prasad,

We maintained it In International trade: Export, and International trade:Import

These are in Org.Views of MMR (MM01).

thank you

NSK


SivaPrasad_Vasireddy
Active Contributor
0 Likes

Hi,

did you maintain in foriegn trade- configuration level

Former Member
0 Likes

Yes