Hi All,
Could any one give me brief explanation( with an example if possible) T-codes for and
a)Sampling drawing procedure
b)Dynamic modification rule
Thanks in advance,
Rai
Request clarification before answering.
Hi,
1. Sample drawing procedure is a master data object in which you plan the drawing of physical samples. In the sample-drawing procedure, you specify:
u2022 Which categories of physical samples must be drawn
u2022 How many physical samples must drawn
u2022 The size of each physical sample
u2022 Whether the drawing of physical samples must be confirmed
Use
The system uses the information in the sample-drawing procedure together with the information in the inspection plan to calculate the physical sample sizes, and to create physical-sample records when an inspection lot is created.
Tocde : QPV2
2. Dynamic modification rule is a master record that contains the definition of the inspection stages and the conditions for an inspection stage change. Inspection stage changes occur on the basis of the inspection results that are recorded for inspection lots and inspection characteristics (that is, on the basis of their acceptance or rejection).
Use
You can use dynamic modification rules to vary the inspection scope or change the inspection severity if the inspection scope remains the same. You can store a dynamic modification rule in one of the following places:
In the inspection plan at header level
In the inspection plan at characteristic level
In the material master at inspection type level (if you want the system to dynamically modify the inspection scope without the use of a task list and/or material specification).
Tcode : QDR1
Vishal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 13 | |
| 13 | |
| 6 | |
| 6 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.