Hello team,
I would ask you kindly if it is normal behavior that during creation of planned order via API from external system to SAP (POST method) there is a missing component in the payload (xml file).
The planned order is relevant for REM process and the BOM contains co-products.
There is one tag A_PlannedOrderComponentType for component P-0000000260 while is missing the co-product component L-2000020.
I checked configuration about REM and it is ok, I tried to find some details on several forums and maybe component with negative required quantity is not considered during API execution?
CS03 with material L-2000022, plant ARB0 and usage 1.
If you need more details let me know.
Thanks,
Giustina
Request clarification before answering.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 18 | |
| 13 | |
| 8 | |
| 6 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.