cancel
Showing results for 
Search instead for 
Did you mean: 

COGS

08-13-2008 9:37 PM
319 views 4 comments
0 Likes
SAP Managed Tags
Subscribe

Hi

Can any one please explain, from where COGS can be captured to CO-PA, the flow.

Thank you

0 Likes

Accepted Solutions (0)

Answers (4)

Answers (4)

0 Likes

Hi,

The COGS is normally transferred to COPA via condition VPRS on the invoice

former_member674271
Contributor
0 Likes

Hi,

Usually valuation with cost estimate are used to capture the COGS to CO-PA.

1. Define Valuation Strategy by Tcode KE4U

(steps 2 to 3 are under path: IMG\Controlling\Profitability Analysis\Master Data\Valuation\Setup Valuation Using Material Cost Estimate)

2. Define access to standard cost

3. Assgin costing keys to products/material types/any charactoristics

4. Assign value fields

We usually define settings for revenue capture by KE4I

Former Member
0 Likes

Hi,

We have Value fields in costing based CO-PA to capture the values & Quantities.

These value fields will be mapped with the SD condition types in transaction code -KE4I,to transfer the revenues.

The costs will be transfered from Cost Centers(Cost center to CO-PA assessment).

The material costs will be transfered from Cost estimates(Product Costing).

I hope you got it.

Thanx,

Chiranjeevi.

Former Member
0 Likes

Hi,

You would have defined the value fields in COPA in KEA6. Now that field would have been defined in Sales Condition Type in KE4I.

Regards,

Jigar