i make sales order with material x and quantity 1 when i make avilability check i didn't get confirmed quantity at the requested delivery date although there's 100 pc from material x in storage location.

the system propose delivery date after requseted delivery date by 9 days

i checked the configuration of shipping point and make

pick time from 1 to 0

loading time from 1 to 0

when i make sales order with same material and the same quantity of above sales order. the system propose delivery date after requested delivery date by 7 days

the RLT is not activated on checking scope

can any one tell me from where dose the system get the appended 7 days?

thanks in advance.

0 Likes
View Entire Topic
Lakshmipathi
Active Contributor

Check in VOV8 whether any value is maintained for the field Lead time in days. Then check in your material master MRP2 view for the two fields In-house production and GR Processing Time

thanks

G. Lakshmipathi

Former Member
0 Likes

thanks Lakshmipathi your answer solve my problem.

and thanks all for your efforts but i have a comment on the answer of checking lead time in sales document type

lead time in sales document type to retrive required delivery date.

Regards;

Mohammad mansour