Activity Time put wrongly

03-15-2020 12:25 PM
611 views 3 comments
0 Likes
Subscribe

Dear Sir,

There is Wrongly put Activity time higher then actual in CO11N during production confirmation. what are the drawbacks as per FI and how can I correct it.

0 Likes

Accepted Solutions (0)

Answers (2)

Answers (2)

lingaiahvanam
SAP Champion
SAP Champion

Hi,

Production order actual activity times confirmed more than planned times, review the order cost analysis and check the variance first.

After variance review check with controlling teal to adjust it if order settlement completed controller can reverse the settlement and reprocess again.

If all posting in the previous period then only option to discuss with the controlling team and adjust the actual cost against production order.

Best Regards,

Lingaiah

0 Likes

Dear Mr. Wang,

The Confirmation is of old date and material consumed in next process also. So I unable to proceed using CO13.