2007 Feb 23 2:02 PM
Dear All,
While a upload the DATE using LSMW, i not upload properly.
12.12.2006 is the date i have to upload in my database.
but it taking 12.12.2019. i don't why?
Then I increased the length of the date from 8 to 10. in the
Step 3: Maintain Source Fields
I getting 12122006 for 12.12.2006 with out , so it unable to insert into the database.
Regards,
Surjith
Dear All,
While a upload the DATE using LSMW, i not upload properly.
12.12.2006 is the date i have to upload in my database.
but it taking 12.12.2019. i don't why?
Then I increased the length of the date from 8 to 10. in the
Step 3: Maintain Source Fields
I getting 12122006 for 12.12.2006 with out , so it unable to insert into the database.
Regards,
Surjith
2007 Feb 25 3:32 AM
Hi Surjith,
May i know the transaction to which u r uploading the data..?
did u try posting the date in the format YYYYMMDD.
Reward points if helpful...
2007 Feb 25 3:41 AM
Hi Surjith,
If u r having the date format as DD.MM.YYYY in your flat file then in the third step choose the same format corresponding to that then u r able to upload the date.
SRI
2007 Feb 26 9:20 AM
| User | Count |
|---|---|
| 4 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |