2008 Aug 12 8:32 AM
Hi,
I got a requirement for running MRP at PLANT LEVEL. I have developed an userexit such that when its triggered it will
consider only HALB and FERT Materials and not for ROH ( ie Pur.Req will not be generated ) and in the same way my
client want the next userexit such that while running the MRP it should consider only ROH ( ie Pur.Req should be
generated ) and Planned Order for HALB and Fert should not generated. I couldn't do this requirement in userexit
without exploding the BOM .( I feel only if we explode the BOM PR will be generated, but my client don't want planned
order generated for HALB and FERT materials ) ( i cannot use md02) Can anyone tel me the logic or the Method
possible to meet this requirement.
Hi,
I got a requirement for running MRP at PLANT LEVEL. I have developed an userexit such that when its triggered it will
consider only HALB and FERT Materials and not for ROH ( ie Pur.Req will not be generated ) and in the same way my
client want the next userexit such that while running the MRP it should consider only ROH ( ie Pur.Req should be
generated ) and Planned Order for HALB and Fert should not generated. I couldn't do this requirement in userexit
without exploding the BOM .( I feel only if we explode the BOM PR will be generated, but my client don't want planned
order generated for HALB and FERT materials ) ( i cannot use md02) Can anyone tel me the logic or the Method
possible to meet this requirement.
2008 Oct 03 11:01 AM
2008 Oct 03 11:02 AM
2008 Dec 12 9:45 AM
I need to implement the same for ROH type of object
Can u tell me how to do this...
2008 Dec 12 9:46 AM
I need to implement the same for ROH type of object
Can u tell me how to do this...