Result Analysis key in PS

Former Member
0 Likes
740

Hi,

I am new to Project Systems. I have a requirement for CJ20n tcode that depending on the priority field in the Basic data tab & dates in scheduling tab of Network header i have to set the Superior WBS elements Result analysis key to some value which is in control tab.

is there any way so that i can get both Basic tab data & Scheduling tab data? any BADI or User exit or any other way?

As mine 4.6 i did'nt find more BADIs on this.

Thanks & Regards,

Veni.

Hi,

I am new to Project Systems. I have a requirement for CJ20n tcode that depending on the priority field in the Basic data tab & dates in scheduling tab of Network header i have to set the Superior WBS elements Result analysis key to some value which is in control tab.

is there any way so that i can get both Basic tab data & Scheduling tab data? any BADI or User exit or any other way?

As mine 4.6 i did'nt find more BADIs on this.

Thanks & Regards,

Veni.

2 REPLIES 2
Read only

Former Member
0 Likes
538

Hi,

Hope the below 2 user exits will be helpful for your requirement.

Function Exit Include

EXIT_SAPLCJWB_004 ZXCN1U21

EXIT_SAPLCJWB_005 ZXCN1U22

<REMOVED BY MODERATOR>

Thanks,

Srinivas

Edited by: Alvaro Tejada Galindo on Apr 9, 2008 5:47 PM

Read only

Former Member
0 Likes
538

Hi,

Substitutions in PS may help you. Talk to your functional consultant.