produced qualtity : PP

Former Member
0 Likes
442

hi experts ,

this is very very urgent. its rili getting my head in. please help me in ds regard.

following is the selection screen :

Location : to

Cost Centre : to

Work Centre : to

Material : to

Production Date(mendatory) : to

i want the actual quatity consumed according to the selection screen. it shud be noted that the consumed quantity shud include all the raw materials and semi-finished goods that have been consumed for the range specifie din selection screen. there must be some doccument that is created while the material is issued for consumption. and that doccument should also give details of location , work center and cost centre and indeed date and material. also all the semi finished goods and raw materials consumed quantities are required to make the report meaningful.

in another part of report i have found the produced quantity from table S028 and exploded the BOM and collected them to get the actual produced quantity.

and the difference of both produced quantity and consumed quantities shall give me the vale of shrinkage.

please help me in ds regard. its vry urgent.

rgds

Aakanksha

hi experts ,

this is very very urgent. its rili getting my head in. please help me in ds regard.

following is the selection screen :

Location : to

Cost Centre : to

Work Centre : to

Material : to

Production Date(mendatory) : to

i want the actual quatity consumed according to the selection screen. it shud be noted that the consumed quantity shud include all the raw materials and semi-finished goods that have been consumed for the range specifie din selection screen. there must be some doccument that is created while the material is issued for consumption. and that doccument should also give details of location , work center and cost centre and indeed date and material. also all the semi finished goods and raw materials consumed quantities are required to make the report meaningful.

in another part of report i have found the produced quantity from table S028 and exploded the BOM and collected them to get the actual produced quantity.

and the difference of both produced quantity and consumed quantities shall give me the vale of shrinkage.

please help me in ds regard. its vry urgent.

rgds

Aakanksha

2 REPLIES 2
Read only

Former Member
0 Likes
411

Hi,

U can get data from these tables. MARA, MARD fields (labst, insme, speme, einme, umlme), MARC-umlme, mssl-sllab and MSEG.

Whether your program includes the alterante top assembly BOM and subassembly BOM in the explosion of the assembly BOM.

Regards,

Suresh

Message was edited by:

SureshKumar Ramamoorthy

Read only

0 Likes
411

hi

suresh

ur reply seems to be of sm help to me

lemme discuss it with my core team members .

thnax for ur reply.

i shall need ur help when i get into the front !

thanx again

aakanksha