Application Development and Automation Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Material Change using idoc

aayushaggarwal
Active Participant
0 Likes
800

Hi Experts,

Need your advise,

Actually my scenario is, that i am creating the Material using inbound idoc with Basic Type: MATMAS05 and Message Type: MATMAS,

now i need to change the same material, how can i achieve that??

Say, I have created a Material with MATNR: ABC using inbound MATMAS idoc, now how can i change it??

Aayush

1 REPLY 1
Read only

JL23
Active Contributor
0 Likes
496

It always depends on what you need to change.

In general you just need a new IDOC with the new values for the same material number.

It will automatically overwrite the old values, except you want to change values that are no longer allowed to be changed.