2012 Jul 23 7:37 PM
Hey guys!
I've gotten a requirement from my client to write a machine utilization report. It's basically CM01, but for the past or present.
They would like to be able to input MRP controller or Workcenter and Dates as input, but I am having a difficult time linking MRP Controller (dispo) to KBED table. I've looked for hours, and will reward anyone who knows a link between the two.
Thanks!
Hey guys!
I've gotten a requirement from my client to write a machine utilization report. It's basically CM01, but for the past or present.
They would like to be able to input MRP controller or Workcenter and Dates as input, but I am having a difficult time linking MRP Controller (dispo) to KBED table. I've looked for hours, and will reward anyone who knows a link between the two.
Thanks!
2012 Jul 24 2:05 PM
Hi Tom,
There is no way to link at the master data Level. The link between the two can be found only at the Production Order.
For alll the Production orders which are executed at a Particular Work Centre ,check whether the corresponding Production Order has the MRP controller given in the Input...
The MRP Controller is something which is set at a Material Level, where as ,the Work Centre is a place where a Material is going to get Manufactured via a Production Order
| User | Count |
|---|---|
| 3 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |