2009 Oct 21 2:20 PM
I have created a set of characteristics which I assign to each service line item in the sales order.
How do I link these characteristics to table VBAP?
I have created a set of characteristics which I assign to each service line item in the sales order.
How do I link these characteristics to table VBAP?
2009 Oct 21 3:36 PM
Hi,
The exact technical solution will depend upon how you are using characteristics and your configuration. As an example take a look at this earlier post:
The characteristic data and values are stored in CABN and AUSP. You need an object number/internal chacteristic value to access the tables. Depending upon your configuration this link could be via something such as the material, customer or WBS.
Regards, David
2009 Oct 21 3:55 PM
David,
This is the scenario:
Example 1
Material Code = 123
Title = Training 1
Delivery Type = Classroom Learning
Language = English
Currency = USD
Example 2
Material Code = 123
Title = Training 2
Delivery Type = On Demand
Language = French
Currency = EUR
I used variant configuration:
I did the following:
1. Created a configurable material 123 with material type KMAT
2. Created a class1 with variant class 300
3. Created characteristics title, delivery type, language
4. Assigned values to each characteristic like titleu2026training 1 & 2, delivery typeu2026Classroom & on-demand and languageu2026.. English & French
5. No Pricing attached to table SDCOM, Field Name VKOND
I have to assign each combination of the above variant to a wbs element :
e.g:
Line item 1 in sales orderu2026u2026u2026u2026u2026u2026u2026..Training 1 u2013 Classroom training u2013 Englishu2026u2026u2026u20262 LU X $1000 = $2000u2026u2026assigned to WBS element
Line item 2 in sales orderu2026u2026u2026u2026u2026u2026u2026..Training 2 u2013 Classroom training u2013 Frenchu2026u2026u2026u2026.1 LU X $1200 = $2400u2026u2026assigned to WBS element
Line item 3 in sales orderu2026u2026u2026u2026u2026u2026u2026..Training 3 u2013 On Demand training u2013 Englishu2026u2026u2026..2 LU X $2000 = $4000u2026u2026assigned to WBS element
Totalu2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026u2026$8400
This is not pure variant configuration as there is no pricing to VA00
the process is working but for reporting
Saliim
2009 Oct 22 11:50 AM
Hi,
If you are using WBS then try linking via the WBS master data table PRPS - use the WBS element PSPNR which is in VBAP.
Regards, David
2009 Oct 22 11:53 AM
2009 Oct 22 3:00 PM
Just to summarize:
VBAP table will fetch a unique configuration number for each line item. use this configuration number in FM: vc_i_getconfiguration to get the data.
The report can be configured around the function module...
Thanks
David and Soumyaprakash.