2008 Aug 27 12:43 PM
Hi,
I want to use program RHALEINI (tcode PFAL) with a variant.
In the field "Data selection period from" I want to have a value like current date - x.
In the Variant Attributes I select "D" for Selection variable (Dynamic date calculation) and as Variable name I select Current date +/- 30.
Then I get the message "Lower limit of interval is greater than upper limit"
Could somebody help?
Thanks and regards
Patrick
Hi,
I want to use program RHALEINI (tcode PFAL) with a variant.
In the field "Data selection period from" I want to have a value like current date - x.
In the Variant Attributes I select "D" for Selection variable (Dynamic date calculation) and as Variable name I select Current date +/- 30.
Then I get the message "Lower limit of interval is greater than upper limit"
Could somebody help?
Thanks and regards
Patrick
2008 Aug 27 1:04 PM
Hi
I think the LOW date is greater then HIGH date that's y it is triggering that error give the dates properly
Regards
Pavan
2008 Aug 27 1:05 PM
Hi,
Check if you have given the values / settings to Low field of the date (select option).
In that case, give these settings only to the High field of selection option date.
Regards,
Wajid Hussain P.
2008 Aug 28 8:35 AM
Hi,
at the moment I have selected "Current date" for "Name of Variable" of the field "Data selection period from".
If I try to select for example "First day of previous month" nothing happens.
If I select "Current date - 30" I still have the same error message mentioned above "Lower limit of interval is greater than upper limit".
But the lower limit should be less than before.
I would be very thankful if someone could explain this behaviour.
It works in ERP 5.0 but it's not working in ECC 6.0.
Regards
Patrick
Edited by: Patrick Koehnen on Aug 28, 2008 3:28 PM
2008 Sep 12 5:08 PM
i have the same problem...
anyone could solve this?!
best regga