2018 Feb 09 6:22 AM
When creating the material through mm01 and when on classification tab if i am taking the class type 023.its taking too much time for next screen.can any one suggest me?
When creating the material through mm01 and when on classification tab if i am taking the class type 023.its taking too much time for next screen.can any one suggest me?
2018 Feb 09 9:11 AM
Did you execute an Abap trace (SAT, SE30) to find the steps with longuer duration?
2018 Feb 09 10:42 AM
I am not in front of an SAP system, but, are you using a standard classification or of your own? What is the time difference between it and others? If you only need a specific part of the classification why not create a narrow one of your own that only contains that? Is this a mandatory part of the material creation process in your system? Because if not, you can skip that part and create the material without it and have a background job/UE/BADI/enhancement do it afterwards.
| User | Count |
|---|---|
| 4 | |
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |