2009 Nov 03 9:35 AM
Hi,
We are in the process of transferring a BOM from a source system to target system.
When we create and change a bom separately , we are getting two idocs but we are not able to get the detail whether it is a creation idoc or a change idoc. Please suggest how to identify the same.
I have referred to a Process code IDOC_INPUT_BOMMAT which internally gets value from the table field combination STZUB/VBKZ ( Insert, Delete, Update ) but how does it gets affected by creating or changing the BOM as this is not included in the standard Message type of BOM idoc ( BOMMAT / BOMMAT04). Is there any specific settings needs to be done in fields MESCOD and MESFCT while defining the partner profile.
Please give your inputs to proceed ahead.
Thanks and Regards,
Hi,
We are in the process of transferring a BOM from a source system to target system.
When we create and change a bom separately , we are getting two idocs but we are not able to get the detail whether it is a creation idoc or a change idoc. Please suggest how to identify the same.
I have referred to a Process code IDOC_INPUT_BOMMAT which internally gets value from the table field combination STZUB/VBKZ ( Insert, Delete, Update ) but how does it gets affected by creating or changing the BOM as this is not included in the standard Message type of BOM idoc ( BOMMAT / BOMMAT04). Is there any specific settings needs to be done in fields MESCOD and MESFCT while defining the partner profile.
Please give your inputs to proceed ahead.
Thanks and Regards,